- Solution Architecture plugin for Copilot Cowork, or this skill on its own: Download SKILL.md
- Claude Code
/plugin install solution-architecture@d365forge- Licence
- CC BY 4.0, by Simon Foote, Robert Peledie
The solution blueprint is the one document that explains how the Dynamics 365 CE solution will deliver the outcomes the programme was funded for. It is what the Success by Design solution blueprint review examines, what the design authority holds the team to, and what a new joiner reads to understand why the system looks the way it does. Without it, each module workstream designs in isolation and the cross-module gaps only appear in system integration testing.
Blueprints usually fail in one of two ways. Some become a feature catalogue that restates product documentation and never says which business process each feature serves. Others are written well at the end of Initiate and then left alone, so by Prepare they describe a solution that no longer exists.
When to use
- Design is starting after the charter and scope are agreed, and the team needs a structure for design decisions.
- A Success by Design solution blueprint review, or a later topic review, is approaching.
- A new module, phase or major integration is being added and the blueprint has to absorb it.
- The design authority has found that what is being built no longer matches the documented design.
Not this skill: programme-management:project-charter for business case and scope, business-analysis:fit-gap-analysis for requirement-level fit, solution-architecture:cross-module-data-model for the detailed data model, solution-architecture:environment-strategy for the environment landscape, and integration-and-data:integration-architecture for integration patterns.
Questions to ask first
- Which modules are in scope, in which phase and in what order? Phasing decides what the first baseline must settle and what can stay open.
- Which outcomes and success measures did the charter commit to? Every blueprint chapter should trace back to at least one of them.
- What is already fixed (licences bought, partner, ERP, Microsoft 365 tenant, telephony)? Fixed constraints are inputs to the design, not choices within it.
- Who has authority to approve design decisions? Without a named approver or design authority, decisions get reopened every sprint.
- Will the reviews be run with Microsoft FastTrack or led by the partner? This sets who facilitates each review and how much preparation time it needs.
Approach
Write the blueprint as an argument, not an inventory. For each chapter, state the business need, the design chosen, the alternatives rejected and the reason. Descriptions of what a product feature does belong in links to Microsoft Learn, not in the document.
1. Build the skeleton from the review topics
Organise the blueprint around the areas a Success by Design review will probe, so the review becomes a walk through the document rather than a separate exercise: programme strategy and phasing, application landscape, end-to-end processes, data model, data migration, integration, security, reporting and AI, environments and ALM, testing, cutover and operations. Check the current Dynamics 365 Implementation Guide for the review topics in use.
2. Lead with end-to-end processes
Describe the processes that cross modules first: campaign response to qualified lead, lead to order, issue to resolution, service request to completed work order. For each, show which app owns each step, where records hand over between modules, and whether each step is standard, configured or extended. This is where cross-module gaps surface while they are still cheap to close.
3. Keep a decision log alongside the narrative
Record each significant decision with its context, options, choice, consequences, owner and date. The design authority reviews the log as well as the prose. Link open questions and assumptions to the raid-log so they are actively closed rather than forgotten.
4. Time the reviews deliberately
Hold the solution blueprint review once the design has real shape, typically early in Implement and before build commitments become hard to reverse. Plan topic reviews such as data, security, integration and performance as each area matures, and treat the go-live readiness review in Prepare as a test of whether the built solution still matches this document. Log every finding with an owner and a due date.
5. Baseline, then change through governance
Baseline the blueprint at the end of design and version it. From then on, changes go through the design authority with a short impact note, so the blueprint remains the single description of the solution through Operate.
Outputs
solution-blueprint, versioned and baselined at the end of design.- An architecture decision log covering every significant choice and its rationale.
- An end-to-end process coverage matrix showing module ownership and fit (standard, configured, extended).
- Review findings, assumptions and open questions recorded in the
raid-log.
Scale notes
SMB
One consultant often writes the blueprint while also configuring, so keep it short and focused on the decisions that matter: process coverage, data model, security model, environments and ALM. A single review with the partner and customer leads can replace a formal review board. Do not skip the security and ALM chapters because they look small; they are the ones that are most expensive to fix after go-live.
Enterprise
Each module workstream contributes a chapter owned by its lead, while the solution architect owns the cross-module chapters and the decision log. The design authority approves the baseline and every later change. Expect several topic reviews with Microsoft or the partner, and reserve time in the delivery plan to respond to their findings.
Hand-offs
Once the blueprint is baselined, programme-management:delivery-plan sequences the build, solution-architecture:cross-module-data-model and solution-architecture:environment-strategy detail their chapters, and integration-and-data:integration-architecture takes the integration chapter forward. Sign-off is needed from design-authority:design-review, with security-compliance:security-model-review for the security chapter.
Sources
references/sources.md in this skill lists the outside authorities for the questions here, what each is authoritative for, and what you may do with it. Check the current Microsoft Learn documentation before stating how a feature behaves, because Dynamics 365 changes monthly, and cite what you used.
Never
- Baseline a blueprint that lists features without tracing them to processes and outcomes.
- Treat the solution blueprint review as a one-off event the document never has to answer to again.
- Change a baselined design decision without recording it in the decision log.
- Present the blueprint as complete while the security, data migration or ALM chapters are placeholders.
Sources for this skill
Application lifecycle management with Microsoft Power Platform
- Publisher: Microsoft (Global)
- Link: https://learn.microsoft.com/en-us/power-platform/alm/
- Authoritative for: Solutions, publishers, layering, source control and deployment practice for Dataverse-based apps.
- What you may do: Read and cite. Summarise in your own words; do not reproduce the text.
- Last checked: 2026-10-15
Dynamics 365 implementation guide
- Publisher: Microsoft (Global)
- Link: https://learn.microsoft.com/en-us/dynamics365/guidance/implementation-guide/overview
- Authoritative for: Microsoft's guidance for planning and running Dynamics 365 implementations, structured by the Success by Design stages.
- What you may do: Read and cite. Summarise in your own words; do not reproduce the text.
- Last checked: 2026-10-15
Introduction to the Success by Design framework
- Publisher: Microsoft (Global)
- Link: https://learn.microsoft.com/en-us/dynamics365/guidance/implementation-guide/success-by-design
- Authoritative for: The five Success by Design stages and the review points Microsoft and partners use to address project risk.
- What you may do: Read and cite. Summarise in your own words; do not reproduce the text.
- Last checked: 2026-10-15
Managed Environments overview
- Publisher: Microsoft (Global)
- Link: https://learn.microsoft.com/en-us/power-platform/admin/managed-environment-overview
- Authoritative for: Governance features available to Managed Environments.
- What you may do: Read and cite. Summarise in your own words; do not reproduce the text.
- Last checked: 2026-10-15
Microsoft Power Platform admin documentation
- Publisher: Microsoft (Global)
- Link: https://learn.microsoft.com/en-us/power-platform/admin/
- Authoritative for: Environments, capacity, data policies, monitoring and tenant settings.
- What you may do: Read and cite. Summarise in your own words; do not reproduce the text.
- Last checked: 2026-10-15
Ownership-based security in Microsoft Dataverse
- Publisher: Microsoft (Global)
- Link: https://learn.microsoft.com/en-us/power-platform/admin/wp-security-cds
- Authoritative for: Security roles, business units, teams and record ownership in Dataverse.
- What you may do: Read and cite. Summarise in your own words; do not reproduce the text.
- Last checked: 2026-10-15
Power Platform Well-Architected
- Publisher: Microsoft (Global)
- Link: https://learn.microsoft.com/en-us/power-platform/well-architected/
- Authoritative for: Design principles for reliability, security, performance and operational excellence on Power Platform.
- What you may do: Read and cite. Summarise in your own words; do not reproduce the text.
- Last checked: 2026-10-15
Requests limits and allocations
- Publisher: Microsoft (Global)
- Link: https://learn.microsoft.com/en-us/power-platform/admin/api-request-limits-allocations
- Authoritative for: Request limits and allocations that constrain integrations, flows and migrations.
- What you may do: Read and cite. Summarise in your own words; do not reproduce the text.
- Last checked: 2026-10-15
Credit
This skill was created by Simon Foote and Robert Peledie as part of D365Forge, licensed under CC BY 4.0 (https://creativecommons.org/licenses/by/4.0/). Credit them when you share or adapt it; see https://github.com/SimonFoote-greensparx/D365Forge/blob/main/NOTICE.md.